186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.
Systems Used:
More Work
Location
Charleston, SC
Type
Educational Facilities
Coverage
4,010 SF
Completed
2014
AEC's ALPHA 'S' panels conform to stairs with the ease of electric operation. Flexible space division for lecture halls, breakout sessions, and collaborative learning environments. Completed 2014.
Advanced Equipment Corporation at Trident Technical College, electric continuously hinged ALPHA 'S' panels on #1A track, manual ALPHA 'U' individual and paired panels on #2 track. The installation provides flexible space division for lecture halls, breakout sessions, and collaborative learning environments. The electric continuously hinged panels feature a standard fabric finish; panels conform to stairs offering smooth automated operation for faculty and staff. The manual paired panels provide additional flexibility for smaller breakout configurations, allowing the college to adapt spaces quickly between classes and events.
Operation Type
Finishes
Dual-system operable partition installation at Trident Technical College