186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.
Systems Used:
More Work
Location
Bothell, WA
Type
Educational Facilities
Coverage
2,920 SF
Completed
2004
Electric continuously hinged bi-parting ALPHA 'U' panels on #8 track, plus manual paired ALPHA 'S' panels on #1 track. Completed 2004.
Advanced Equipment Corporation operable partition system at Cedar Park Christian School in Bothell, Washington. The installation features both electric and manual operation options, providing maximum flexibility for the school's classroom and gymnasium facilities. The electric system utilizes continuously hinged ALPHA 'U' panels with bi-parting configuration on a #8 track, allowing for smooth automated operation of the full-width partition that divides the main gymnasium space. This setup enables staff to quickly reconfigure the gym for multiple simultaneous activities.
Full-width ALPHA 'U' continuously hinged panels with electric bi-parting operation on #8 track