186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.
Systems Used:
More Work
Location
Lubbuck, TX
Type
Educational Facilities
Coverage
4000 SF
Completed
2025
Architect
Parkhill Architecture
High school academic wing featuring manual and electric operable partitions including stair-conforming panels spanning two runs. Completed 2025.
Advanced Equipment Corporation supplied and installed operable partition systems throughout the academic wing of LCISD Liberty Hill High School, approximately 4,000 square feet of operable partitions divide lecture halls for flexible learning spaces. The project includes both manual and electric partitions tailored to the school's programming needs. A standout feature of this installation is the stair-conforming panel configuration — panels engineered to follow two successive staircase runs, maintaining full acoustic closure across a changing floor plane. This solution allows the auditorium and adjacent spaces to be acoustically divided or opened without sacrificing the building's architectural character.
Electric operable partition wall fully closed across the auditorium — stacked bleacher seating visible at right