Project Overview
30,270 SF manual operable partition system with remote storage and pocket doors. SIGMA 'E' panels with carpet finish. Completed 2017.
Advanced Equipment Corporation installed a 30,270 square foot manual operable partition system at the Yucatan Convention Center in Yucatan, Mexico. The installation features remote storage with pocket doors and individual SIGMA 'E' panels on #1 track, providing flexible space reconfiguration for large convention and event operations. The manual operation gives facility staff precise control over space division without the need for electrical power, ensuring reliability and cost-effectiveness. The remote storage design allows panels to be completely concealed when not in use, maximizing the open floor space for large events and exhibitions. With a carpet finish and completed in 2017, this system exemplifies AEC's expertise in delivering large-scale convention center solutions that combine durability, functionality, and aesthetic appeal for demanding commercial applications.




