Advanced Equipment Corporation
Contact
Loading projects...
Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714 635-5350

Systems

Manual

  • Paired Panels
  • Individual Panels
  • Image Series (Glass Walls)
  • Curved Panel Systems

Electric

  • Continuously Hinged Panels
  • Spacematic Automation
  • Vision

Applications

  • Convention Centers
  • Hospitality
  • Educational Facilities
  • Places of Worship
  • Commercial
  • Specialties

Resources

  • Projects
  • Documents & Technical Data
  • Build a Spec

Company

  • About Us
  • Get a Quote
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of Service
Temple Israel

Worship

Temple Israel

Long Beach, CA

Location

Long Beach, CA

Type

Worship

Coverage

588 SF

Completed

2012

General Contractor

HALE CORPORATION

Project Overview

588 SF dual-system installation combining electric continuously hinged SIGMA 'C' panels on #1 track with manual paired SIGMA 'C' panels on #1 track, both featuring custom wood veneer finish and concealed SOSS hinges for pocket doors. GC: Hale Corporation. Completed 2015.

Advanced Equipment Corporation installed a bi-fold operable partition-system at Temple Israel in Long Beach, California. The installation combines electric continuously hinged SIGMA 'C' panels on #1 track, this project also includes manual paired systems with SIGMA 'C' panels, both featuring custom wood veneer finish and concealed SOSS hinges for pocket doors. Custom wood veneer finish matched the temple's existing architectural woodwork. The dual-system approach provides both automated convenience for large events and manual flexibility for smaller gatherings. The concealed SOSS hinges on the pocket doors maintain clean sight lines when the partitions are stored, preserving the sanctuary's aesthetic integrity.

Systems Used

Continuously Hinged PanelsPaired PanelsPassdoors & Pocket Doors

Track Systems

#1 Track System

Series Used

SIGMA 'C' Panel

More Work

Similar Projects

View All
Jacob Javits Convention Center
Featured
Convention Centers

Jacob Javits Convention Center

New York, NY

186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.

Systems Used:

Spacematic Automation
Coverage186,446 SF
Details →
Tillamook Bay Community College
Featured
Educational Facilities

Tillamook Bay Community College

Tillamook, OR

Community college with manual and electric operable partitions, vertical grain wood veneer finish, Image 'J' panel manual slider, and integrated pass-doors. Completed 2025.

Systems Used:

Passdoors & Pocket Doors
Coverage1748 SF
Details →
LCISD Liberty Hill High School
Featured
Educational Facilities

LCISD Liberty Hill High School

Lubbuck, TX

High school academic wing featuring manual and electric operable partitions including stair-conforming panels spanning two runs. Completed 2025.

Systems Used:

Passdoors & Pocket Doors
Coverage4000 SF
Details →

Operation Type

Electric OperationManual Operation

Finishes

Custom Wood Veneer Finish

Specifications

Invisible SOSS Hinges

Project Gallery

Temple Israel-AE Temple Israel-0092
1 / 8

Dual-system installation combining electric and manual SIGMA 'C' panels with custom wood veneer