186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.
Systems Used:
More Work
Location
Long Beach, CA
Type
Worship
Coverage
588 SF
Completed
2012
General Contractor
HALE CORPORATION
588 SF of operable partitions consisting of SIGMA 'C' panel construction in both electric and manual operation on #1 track, both featuring custom wood veneer finish and concealed SOSS hinges for pocket doors. GC: Hale Corporation. Completed 2015.
Advanced Equipment Corporations installations at Temple Israel in Long Beach, California. The installation includes a bi-parting electric operable wall consisting of SIGMA 'C' panel construction and a manually operated partition, both on #1 track, both featuring custom wood veneer finish and concealed SOSS hinges for pocket doors. Custom wood veneer finish matched the temple's existing architectural woodwork. The concealed SOSS hinges on the pocket doors maintain clean sight lines when the partitions are stored, preserving the sanctuary's aesthetic integrity.
Finishes
Specifications
Installation of bi-parting electrically operated SIGMA 'C' panels with custom wood veneer finish