Advanced Equipment Corporation
Contact
Loading projects...
Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714 635-5350

Systems

Manual

  • Paired Panels
  • Individual Panels
  • Image Series (Glass Walls)
  • Curved Panel Systems

Electric

  • Continuously Hinged Panels
  • Spacematic Automation
  • Vision

Applications

  • Convention Centers
  • Hospitality
  • Educational Facilities
  • Places of Worship
  • Commercial
  • Specialties

Resources

  • Projects
  • Documents & Technical Data
  • Build a Spec

Company

  • About Us
  • Get a Quote
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of Service

More Work

Similar Projects

View All
Jacob Javits Convention Center
Featured
Convention Centers

Jacob Javits Convention Center

New York, NY

186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.

Systems Used:

Spacematic Automation
Coverage186,446 SF
Details →
Tillamook Bay Community College
Featured
Educational Facilities

Tillamook Bay Community College

Tillamook, OR

Community college with manual and electric operable partitions, vertical grain wood veneer finish, Image 'J' panel manual slider, and integrated pass-doors. Completed 2025.

Systems Used:

Passdoors & Pocket Doors
Coverage1748 SF
Details →
LCISD Liberty Hill High School
Featured
Educational Facilities

LCISD Liberty Hill High School

Lubbuck, TX

High school academic wing featuring manual and electric operable partitions including stair-conforming panels spanning two runs. Completed 2025.

Systems Used:

Passdoors & Pocket Doors
Coverage4000 SF
Details →
San Diego Library

Specialties

San Diego Library

San Diego, CA

Location

San Diego, CA

Type

Specialties

Coverage

2,277 SF

Completed

2014

Architect

TUCKER SADLER ARCHITECTS

General Contractor

TURNER CONSTRUCTION

Project Overview

2,277 SF electric dual-system installation combining IMAGE 'J' glass panels on #6 track with ALPHA 'T' panels on #1 track. Modern public library pavilion with flexible meeting and event spaces. Arch: Tucker Sadler Architects. GC: Turner Construction. Completed 2014.

Advanced Equipment Corporations installation of an exterior bi-parting electric operable partitions at the San Diego Central Library. The IMAGE 'J' glass panels offer acoustic separation from the exterior environment while letting in the light, providing visual connectivity, perfect for library environments where natural light is important. Architect Tucker Sadler Architects designed the space with flexibility in mind, and general contractor Turner Construction executed the installation to the highest standards. The electric operation allows library staff to easily transform spaces throughout the day.

Track Systems

#6 Track System#1 Track System

Series Used

IMAGE 'J' PanelALPHA 'T' Panel

Operation Type

Electric Operation

Project Gallery

San diego1
1 / 3

Electric dual-system installation combining IMAGE 'J' glass panels with ALPHA 'T' panels