186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.
Systems Used:
More Work
Location
San Diego, CA
Type
Specialties
Coverage
2,277 SF
Completed
2014
Architect
TUCKER SADLER ARCHITECTS
General Contractor
TURNER CONSTRUCTION
Electric bi-parting installation utilizing IMAGE 'J' glass panels on #6 track. Modern public library pavilion with flexible spaces. Arch: Tucker Sadler Architects. GC: Turner Construction. Completed 2014.
Advanced Equipment Corporations 2,277 SF of operable partition installations includes an exterior bi-parting electric operable partition at the San Diego Central Library featuring the IMAGE 'J' glass panel construction, providing visual connectivity, perfect for library environments where natural light is important. Architect Tucker Sadler Architects designed the space with flexibility in mind, and general contractor Turner Construction executed the installation to the highest standards.
Operation Type
Specifications
Electric dual-system installation combining IMAGE 'J' glass panels with ALPHA 'T' panels