186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.
Systems Used:
More Work
Location
San Diego, CA
Type
Specialties
Coverage
2,277 SF
Completed
2014
Architect
TUCKER SADLER ARCHITECTS
General Contractor
TURNER CONSTRUCTION
2,277 SF electric dual-system installation combining IMAGE 'J' glass panels on #6 track with ALPHA 'T' panels on #1 track. Modern public library pavilion with flexible meeting and event spaces. Arch: Tucker Sadler Architects. GC: Turner Construction. Completed 2014.
Advanced Equipment Corporations installation of an exterior bi-parting electric operable partitions at the San Diego Central Library. The IMAGE 'J' glass panels offer acoustic separation from the exterior environment while letting in the light, providing visual connectivity, perfect for library environments where natural light is important. Architect Tucker Sadler Architects designed the space with flexibility in mind, and general contractor Turner Construction executed the installation to the highest standards. The electric operation allows library staff to easily transform spaces throughout the day.
Electric dual-system installation combining IMAGE 'J' glass panels with ALPHA 'T' panels