Advanced Equipment Corporation
Contact
Loading projects...
Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714 635-5350

Systems

Manual

  • Paired Panels
  • Individual Panels
  • Image Series (Glass Walls)
  • Curved Panel Systems

Electric

  • Continuously Hinged Panels
  • Spacematic Automation
  • Vision

Applications

  • Convention Centers
  • Hospitality
  • Educational Facilities
  • Places of Worship
  • Commercial
  • Specialties

Resources

  • Projects
  • Documents & Technical Data
  • Build a Spec

Company

  • About Us
  • Get a Quote
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of Service

More Work

Similar Projects

View All
Jacob Javits Convention Center
Featured
Convention Centers

Jacob Javits Convention Center

New York, NY

186,446 SF across 3 projects (2013-2021) featuring manual operation and Spacematic automated ALPHA series panels with remote storage. One of the largest convention center partition installations in North America.

Systems Used:

Spacematic Automation
Coverage186,446 SF
Details →
Tillamook Bay Community College
Featured
Educational Facilities

Tillamook Bay Community College

Tillamook, OR

Community college with manual and electric operable partitions, vertical grain wood veneer finish, Image 'J' panel manual slider, and integrated pass-doors. Completed 2025.

Systems Used:

Passdoors & Pocket Doors
Coverage1748 SF
Details →
LCISD Liberty Hill High School
Featured
Educational Facilities

LCISD Liberty Hill High School

Lubbuck, TX

High school academic wing featuring manual and electric operable partitions including stair-conforming panels spanning two runs. Completed 2025.

Systems Used:

Passdoors & Pocket Doors
Coverage4000 SF
Details →
Hyatt Regency Lake Washington

Hospitality

Hyatt Regency Lake Washington

Renton, WA

Location

Renton, WA

Type

Hospitality

Coverage

8,713 SF

Completed

2017

Architect

MULVANY G2 ARCHITECTS

General Contractor

SELLEN CONSTRUCTION CO.

Project Overview

Premium hospitality operable partition system across 8,713 SF at the Hyatt Regency Lake Washington, featuring custom walnut wood-veneer and AEC Standard fabric finishes. Completed 2017.

Advanced Equipment Corporation supplied and installed 8,713 square feet of manual operable partition systems throughout the event and meeting space at the Hyatt Regency Lake Washington at Seattle's Southport, one of the Pacific Northwest's premier waterfront hotel properties. The installation was completed in 2017 in collaboration with general contractor Sellen Construction Co. and architect Mulvany G2 Architects. The hotel's ballroom and breakout rooms feature a combination of individual and paired panel configurations utilizing #2, #3, and #8 track systems. SIGMA 'B' panels with custom fabric finish provide the primary ballroom division with high acoustic performance required in a luxury hotel event environment while blending seamlessly with the contemporary interior design. A signature detail of the project is the SIGMA 'D' panels finished in custom walnut wood veneer, which serve as statement architectural elements in the hotel's corridor and suite-level spaces. The warm wood finish was custom-matched to the hotel's interior palette, demonstrating Advanced Equipment's ability to deliver premium custom finishes that elevate partition systems beyond functional dividers into featured design elements.

Systems Used

Individual PanelsPaired Panels

Track Systems

#2 Track System#3 Track System
#8 Track System

Series Used

SIGMA 'B' PanelSIGMA 'D' PanelALPHA 'U' Panel

Finishes

Custom Wood Veneer FinishStandard Fabric

Project Gallery

hyaat1
1 / 3

Main ballroom — full-length operable partitions with custom fabric finish, dramatic LED coffered ceiling, and Lake Washington waterfront views