2401 West Commonwealth Avenue, Fullerton, CA 92833
← All Projects
Commercial

Consolidadora Chilena

San Antonio, Chile

Location
San Antonio, Chile
Type
Commercial
Coverage
Completed
2015
Project Overview

Consolidadora Chilena

Eight-system installation combining 3 manual curved and 5 manual remote-stack SIGMA 'C' panel configurations on #2 track. Flexible corporate space.

Advanced Equipment Corporation installed eight operable partition systems for Consolidadora Chilena's San Antonio corporate offices — three manual curved systems (3MC) and five manual remote-stack systems (5MR), all featuring SIGMA 'C' panel construction on #2 track.

The manual curved systems follow the architectural contours of the space, while the remote-stack configurations tuck panels completely out of sight when open, allowing the full floor plate to function as a single unified space. Integrated pass doors within the deployed partition walls maintain circulation flow between zones.

The SIGMA 'C' panel construction with standard vinyl finish provides the acoustic privacy and clean aesthetic required for a professional corporate environment. This multi-system approach gives the facility maximum flexibility for training sessions, conferences, and large company-wide events.

Project Gallery

Ready to start your project?

Our team of experts is here to help you design the perfect operable partition solution.

Request a Quote Contact Us